Chilime Hydropower Station Rescue Log

Engineering research

Original plots and annotations shared by Prashidha Kharel and Shanker Dhakal.

11–15 September 2026 · Preliminary simulations and interpretations, not measured conditions on site.

Air pressure along the tunnels

Prashidha Kharel · Nepal Flood ·

Simulation air-pressure plots for fourteen tunnel and cavern components, with chainage on the horizontal axis and pressure in kilopascals on the vertical axis.
Pressure relative to atmosphere (0 kPa). Prashidha highlighted a pocket near main-access chainage 90–100 m. The dashed curves show the highest pressure at any recorded simulation time.

Retained water by space

Shared by Dr. Eng. Shanker Dhakal ·

Trapped-water simulation table: 4,805 cubic metres of clear water remain in this run, including 1,917 cubic metres in the powerhouse cavern. The table lists volumes, shares, water levels and crown elevations by space.
One simulation run, with water modelled separately from debris. Shanker’s discussion compared retention scenarios and possible tailrace drainage; these volumes do not establish actual water levels.

The main-access / tailrace junction

Shared by Dr. Eng. Shanker Dhakal ·

Annotated reconstruction plan circles the connection from the main access tunnel toward the tailrace gate near chainage 90.8 metres. The source figure credits Kharel, Dhakal, Basnet and Joshi.
Shanker’s marked-up plan focuses on the connection near main-access chainage 90 m. Field identification remained unresolved. The figure’s original credit to Kharel, Dhakal, Basnet and Joshi is preserved.