With thanks to the Chilime engineers who shared drawings, measured sections, elevation references, and context for missing records.
Bimal Khadka
Deputy manager, Chilime Hydropower Company Limited
Archive context
“yo survey, design and construction suru gareko 30 barsa bhanda
paila ho, tesaile section wise coordinate chainna jaha samma
lagchha hai ani head office storema paani pasera dherai
documentharu dubayera/ vijera bigreako pani thiyo”
English translation “The survey, design, and construction began more than 30 years ago. As far as I know, section-wise coordinates may not be available, and many documents in the head-office store were submerged or damaged when water entered.”
This explains why local geometry survives without enough coordinates for precise map placement.
Shyam Sharan Nepal
Chilime engineer
Powerhouse levels“Elevations of powerhouse area”
Handwritten powerhouse levels provided by Shyam Sharan Nepal and transcribed below in metres.
- Top of powerhouse Crown1404.000 m
- Top of EOT crane1399.200 m
- Top of upper bend1392.621 m
- Centre of runner and shaft1389.242 m
- Centre of MIV1386.910 m
- Bottom of MIV pit1384.710 m
- Bottom of pump pit1384.000 m
- Bottom of transformer hall Floor1394.250 m
- Bottom of access tunnel Corrected1398.26 m
- Top of access tunnel Corrected1404.730 m
Additional access-tunnel note At 120 m from the access-tunnel face: bottom 1390.67 m and top 1396.25 m. The source presents this as a distance from the face, not as a surveyed chainage such as Ch. 0+120.